Over time, asphalt can become cracked and pot-holed. Using only crack fill may not necessarily be enough to fix this problem and, Repaving/Overlay may be an overkill. In these types of situations, we saw-cut and remove old damaged asphalt and replace with a min. of 3” of new asphalt patching.
Move the slider left or right to see before and after patching.